Production process

How we manufacture your prefabricated house

At Hus i Bergslagen AB, our production process is designed for maximum precision, efficiency and control. Every step is based on careful planning and digital modeling to ensure high quality and reliable assembly on site.

Husfabriken

1. Final 3D model and component planning

2. Material preparation and precision cutting

3. Volume division and packaging

4. Labeling and documentation

5. Quality control

6. Transportation and delivery coordination

After the order agreement is signed, we complete the 3D model and begin detailed planning of all components.
Each part of the building – walls, floors and roofs – is divided into layers and individual components, such as joists, panels, insulation and board materials. All components are given a unique ID and linked directly to the model database.

Based on the final component list, materials are selected, cut and prepared in our factory.
The wooden elements are cut with high precision based on the 3D model, using modern and calibrated machines to ensure consistent quality.

All components are grouped into manageable volumes depending on the project's methodology:

  • For prefabricated elements, the volumes are adjusted according to applicable transport dimensions.

  • For detached wooden houses, the volumes are adjusted according to the capacity of the assembly team and the conditions of the construction site.

Each volume is packed layer by layer (e.g. facade panel, battens, windbreak, frame, insulation, vapor barrier, OSB, plaster), and all parts for a specific wall are packed together to facilitate assembly.

Each component is marked with a unique ID number that is linked to the 3D model.
This labeling system enables:

  • Traceability of each part

  • Organized packaging and delivery

  • Precise and error-free assembly on site

We also produce a complete set of waterproof assembly drawings and instructions for each element. These include:

  • Assembly order

  • Component placement

  • Connection types (nails, screws, fittings)

  • Mounting instructions (distance, edge dimensions)

Each document also contains a QR code that links to the 3D model for a clear visual overview.

Before delivery, each package and component is checked to ensure that:

  • All parts included

  • Cuts are precise

  • The marking is correct.

  • The packaging follows the planned assembly order.

This check minimizes the risk of errors and delays during installation.

Once everything is packaged and approved, the volumes are loaded and delivered according to the agreed schedule.
We are responsible for:

  • Transport logistics

  • Access instructions to construction site

  • Unloading order adapted to the construction sequence

Our goal is to make work on the construction site as smooth and efficient as possible.